Most expensive manufacturing problems were visible on the model. A DFM checklist is a way to walk a part on purpose before a tool is cut or a program is run. This tool gives process-specific lists for injection moulding (including a low-volume / bridge-tooling path), CNC machining, sheet metal, and casting, with short explanations so the line is not just a tick box.

For moulding, the usual failures are wall-thickness jumps, missing draft, ribs that sink, bosses that are too heavy, and weld lines in the wrong place. For CNC, they are features the cutter cannot reach, inside radii that are sharper than the tool, deep pockets, and tolerances that belong on a ground part, not a mill. Sheet metal has bend relief, hole-to-bend distance, and grain. Casting has draft, fillets, and section changes that freeze in the wrong order.

The lists are written from common practice and typical process advice (for example, rib thickness as a fraction of wall, commercial versus fine moulding tolerances). They are not a vendor’s official design guide. A particular resin, a five-axis cell, or a die-casting house will have tighter or looser rules. Use the checklist to catch the obvious, then review with the people who will make the part.

Run the checklist when the geometry is still cheap to change — after the first serious CAD, not after the kick-off meeting for the tool.

Example

A moulding miss that the list is there to catch. A 4 mm logo boss on a 2 mm ABS wall will almost always sink on the show face. The checklist item is “boss thickness ≤ about 60% of wall.” The fix is usually a cored boss, a local rib, or moving the logo to a recess — not hoping the paint will hide it. Walking that one line before tooling is cheaper than a tool change.

How to use this tool

  1. Pick the process you are actually going to use, not the one you used for the prototype if they differ.
  2. Walk every item with the model open. For each fail, write a change or a reason you are accepting the risk.
  3. Pay extra attention to walls, draft, radii, and anything a tool or a cutter has to enter.
  4. If a tolerance is tighter than the process band in the list, either relax it or change process.
  5. Re-run the list after a significant geometry change, not only once at the start.
Stacked black sheet-metal housings, a reminder that bends and coatings have to be manufacturable.

Frequently asked questions

Which process should I pick if I am still deciding?

Use the process guide first to shortlist, then run the checklist for the leading candidate. If two processes are still in play, run both lists — the part will almost certainly need to change for at least one of them.

Are the numbers (draft, rib ratios, tolerances) mandatory?

They are widely used starting rules, not laws. A specific tool, resin or machine can do better or worse. Record exceptions.

Does the moulding list include tooling cost?

The low-volume moulding list talks about aluminium versus steel, cold versus hot runners, hand loads and MUD frames — enough to ask better questions, not enough to quote a tool.

Can I export a completed checklist?

Use the in-toolkit list as you work and keep a record in your own review notes or PLM. The point is the conversation with the shop, not the file format.